Home 3

1, 1 | |

About this Project:

“Leave no stone unturned, but please don’t touch my basement.” This home experienced major surgery on the main & second level by receiving a two-foot addition onto the main floor, new kitchen, new living room, new master bathroom, and 18 new windows. The entire main floor has been updated with all new trim, cabinets, fireplace, flooring, lighting, and even a new stair system to the second floor. Speaking of the second floor, up there we took a very nice master bathroom and personalized it with a new tile shower, flooring, plumbing fixtures & new countertops. Be sure to step outside and check out the back yard while standing on the new deck! This home was overhauled and personalized down to the in- ceiling sound and the future powered window treatments.

Builder Profile

Sub-Contractors for this project